Kitchen Renovation in Dubai

  • Custom Kitchens Built in Our Own Al Quoz Workshop
  • DM Approved · DEWA Certified · Trading Since 1996
  • In-House Joinery, Stone and MEP Teams
  • Free Site Visit and Itemised Quotation

Halo is a kitchen renovation company in Dubai for apartment and villa kitchens. We coordinate design, cabinetry made in our Al Quoz workshop, worktops, tiling, plumbing, electrics, lighting and appliance installation. Book a free site visit and get an itemised quotation for your agreed scope.

Design, Joinery, Stone, MEP and Installation on One ContractLicensed Contractor with In-House Approvals TeamSoft-Close Hardware Specified in Your QuotationMaterials and Fittings Agreed in WritingItemised Quotation Before Anything Is Demolished

Complete Kitchen Renovation Services in Dubai

Halo covers the whole kitchen: design, manufacture, stone, tiling, plumbing, electrics, lighting and installation. Take all of it, or the part you actually need — a worktop replacement and new fronts is a perfectly reasonable project, and we quote it the same way we quote a full remodel.

Kitchen layout drawing, elevation and door and stone samples on a design studio table in Dubai

Kitchen Design, Layout & 3D Visualisation

Bespoke kitchen design in Dubai starts with the same three questions: who cooks, how often, and what is currently getting in the way. From there we survey the room, check where the drainage, gas and extraction actually run, and draw a layout around how you use the space rather than around a catalogue. You see the scheme in 3D — worktop heights, cabinet runs, appliance positions, the swing of every door — before a single board is cut.

  • Measured survey and layout options
  • 3D visuals, finishes and hardware selection
Kitchen cabinet and countertop review during Halo installation work in Downtown Dubai

Full Kitchen Renovation & Remodelling

Strip-out, disposal, making good, and a complete rebuild of the room. This is the scope most people mean by kitchen remodeling in Dubai: old units and worktops out, walls and floors reset, services re-run where the new layout needs them, then cabinetry, stone, splashback, lighting and appliances installed in sequence by trades who work for the same company.

  • Strip-out, disposal and making good
  • Full rebuild sequenced by one site team
Kitchen cabinetry and island at Halo’s Jumeirah Islands project

Custom Kitchen Cabinets & Joinery

Our cabinets are made in Al Quoz, not ordered in. Carcasses are sized to the surveyed room, with the board specification, sealed edges and any required scribes or fillers agreed in the drawings. Fronts come in lacquer, veneer, matt or gloss laminate, ribbed and fluted timber, or a mix — and the hinges, runners, lift systems and pull-outs are recorded in the fittings schedule with their agreed brand or range. Our own workshop also gives the team a direct route for adjustments or replacement parts.

  • Carcasses and fronts made to your dimensions
  • Agreed soft-close hardware and storage fittings
Kitchen island with integrated sink at Halo’s Paloma project

Islands, Peninsulas & Breakfast Counters

An island only works if the services can reach it and the circulation still works around it. We check the slab, the drainage route and the extraction path first, then design the island around what the room can actually carry — hob or sink, waterfall ends or a thin profile, seating overhang, sockets, bin pull-outs and the storage that stops the worktop filling up again by week three.

  • Island and peninsula planning around services
  • Seating overhangs, sockets and integrated storage
Kitchen island and countertop at Halo’s Paloma project

Quartz, Granite & Marble Worktops

Worktops are templated on site after the cabinets are set, which is the only way to get a tight scribe against a wall that is never quite straight. Quartz for most family kitchens, porcelain where heat and staining matter, granite and natural marble where the client wants the movement of real stone and accepts how it ages. Edge profile, sink cut-out, drainer grooves, upstands and waterfall returns are all fabricated to the drawing.

  • On-site templating after cabinet installation
  • Quartz, porcelain, granite and marble options
Kitchen wall finish, base cabinets and glass wall cabinets at City Walk

Splashbacks, Tiling & Wall Finishes

Behind the hob is where a kitchen either looks finished or looks assembled. We install full-height stone slabs, large-format porcelain, handmade zellige, glass, and microcement where a seamless wall is wanted. Floors are levelled and set out so cuts land where nobody looks, and movement joints go where the tiler knows they belong rather than where they end up by accident.

  • Slab, porcelain, zellige, glass and microcement
  • Floor levelling, setting out and clean junctions
Kitchen first fix in Dubai with capped pipework, socket back boxes and extractor ducting set out on the wall

Plumbing, Electrics & Extraction

Moving a sink two metres sounds trivial until you look at the fall on the waste. Our MEP team reroutes hot and cold feeds, waste and drainage within the limits the building allows, adds circuits and sockets for induction hobs and integrated appliances, and resolves the extraction route — recirculating, ducted to an existing riser, or into the AC strategy — before the ceiling is closed. Water isolation and drain-down are coordinated with the building so your neighbours are not part of the story.

  • Re-routed water, waste and appliance circuits
  • Extraction, ventilation and AC coordination
Kitchen cabinets and illuminated island at Halo’s City Walk project

Kitchen Lighting & Ceilings

Three layers, and most kitchens in Dubai only have one. Task lighting under the wall units so you are not chopping in your own shadow, ambient light from the ceiling set out to the new layout rather than the old one, and accent lighting inside glass units, along plinths or over the island. Gypsum ceilings, coves and stretch ceilings are built where the services and the light fittings need somewhere to live.

  • Task, ambient and accent layers designed together
  • Gypsum, cove and stretch ceiling works
Kitchen cabinetry and appliance wall at Halo’s Paloma project

Appliance Integration & Hardware

Send us the appliance list early and the cabinetry is built around the real cut-out dimensions, ventilation clearances and door swings. Fully integrated fridges, tall-housing ovens at the right height, dishwasher panels that line through, wine cabinets, built-in coffee machines. Soft-close everywhere, plus the pull-outs, corner mechanisms and internal dividers that decide whether the kitchen still works a year later.

  • Built around actual appliance specifications
  • Soft-close, pull-outs and internal organisation
Illuminated display shelf and kitchen storage at Halo’s Paloma project

Pantry, Laundry & Utility Joinery

Most Dubai villas have a second kitchen, a store or a laundry doing the heavy lifting behind the show kitchen — and it is usually the part nobody designs. We fit these out properly: tall pantry units with pull-out larders, appliance garages, washing and drying stacks with worktop over, cleaning stores, and hard-wearing surfaces that take the punishment the main kitchen is not meant to.

  • Pantry, larder and appliance-garage joinery
  • Laundry, store and back-kitchen fit-out

Your Kitchen Specification, Before We Build

A custom kitchen cabinet quote needs more than a door colour. Agree the cabinet construction, worktop, appliance interfaces and hardware schedule alongside the measured layout before manufacture.

Site measurements

Measure each wall and finished ceiling height; record columns, wall alignment, windows, door swings, sockets, water, waste and extraction positions. Check delivery access too.

What to approve: A measured plan, checked on site before production drawings are released.

Cabinet bodies and fronts

Compare the specified MDF or plywood board, thickness, edge treatment and backing separately from the visible laminate, lacquer or veneer. Moisture-resistant board is not waterproof; sink areas still need protection from leaks.

What to approve: A material schedule and physical finish sample, with edges and handles agreed.

Hinges, drawers and storage

Choose soft-close hinges and runners, drawer loads, corner access, bin pull-outs and pantry mechanisms around daily use. Named hardware ranges and availability belong in the quote rather than an assumed brand allowance.

What to approve: A fittings schedule showing the agreed brand or range, quantities and accessories.

Worktops and appliances

Compare quartz, porcelain and natural stone for care, appearance and intended use. Confirm appliance model numbers, cut-outs, ventilation, sink mounting, tap holes, joints and edge details.

What to approve: Coordinated cabinet elevations and appliance information; final worktop templating after cabinets are levelled.

Drawings and sample approval

Review plans, elevations and internal layouts alongside 3D views. Check cabinet widths, door openings, appliance clearances, lighting and access to service components.

What to approve: An approved drawing revision and finish schedule that the workshop can build from.

Manufacture and installation

Cabinets are cut, edged, assembled and finished in our Al Quoz workshop to the approved specification. Site work follows the agreed sequence for removal, services, cabinetry, worktops and appliance connections.

What to approve: An agreed programme, installation checks, snag list and product care and warranty information at handover.

What We Need to Price Your Kitchen

For an initial kitchen renovation estimate in Dubai, send photos, approximate dimensions and the work you want. A firm quotation needs a site survey, agreed materials and a defined scope. You can enquire before you have drawings.

  • Dubai community or building, property type and clear photos of the whole kitchen.
  • Approximate wall lengths and ceiling height; an existing floor plan or designer drawings if available.
  • Cabinets only or a full renovation, and which units, worktops or appliances you want to retain.
  • Preferred front finish and worktop, plus appliance models or a note that these are still undecided.
  • Budget range, preferred timing, whether the home is occupied and known building access rules.

What the quotation should include

Ask the quotation to identify the survey and design scope, cabinet bodies and fronts, fittings, worktops, delivery, installation and finishing. Each item should state the specification and quantity included in your package.

Items to confirm separately

Appliance supply, demolition and disposal, tiling, plumbing or electrical changes, gas work, approval fees, building deposits and VAT treatment need explicit lines. They are included only where the written quotation says so.

If you change the brief

Changing an appliance model, layout, finish or fittings after sign-off can require revised drawings, re-ordering or remanufacture. Agree the price and programme impact in writing before the change proceeds.

Already working with a designer? Send the drawing set and specification. We can quote manufacture and installation against that brief, or discuss a wider design and fit-out scope through our in-house joinery team.

One Kitchen Renovation Company for Design, Joinery & Installation

The usual way a Dubai kitchen goes wrong is not craftsmanship. It is coordination. A showroom sells the cabinets, a handyman does the plumbing, a stone yard cuts the worktop from someone else’s measurements, and nobody was on site the morning the waste pipe turned out to be 60mm lower than anyone assumed.

Halo designs it, manufactures it, runs the services, fits the stone and installs it — all on one contract, all under one project manager.

Book a Free Kitchen Site Visit

Design and selection

Survey, layout options, 3D views, finishes, hardware and appliance coordination in one design package.

Manufacture in our own workshop

Cabinetry, pantry units and island joinery produced in Al Quoz, so the programme is ours to control.

Plumbing, electrics and extraction

Services re-routed to suit the new layout before tiling and cabinetry start, not squeezed in afterwards.

Installation, snagging and handover

Stone templating, appliance connection, silicone, adjustment, snag close-out and a clean kitchen at the end.

Why Dubai Homeowners Choose Halo as Their Kitchen Renovation Company

Kitchen quotes in Dubai are notoriously hard to compare, because every company draws the scope line somewhere different. These are the five things worth testing on any kitchen renovation company you shortlist — this one included.

We Make the Kitchen Ourselves

Halo runs its own joinery factory in Al Quoz. That means the cabinets are sized to your walls rather than to a module chart, the finish is checked before it leaves the workshop, and a damaged door is remade here — not reordered from a European supplier with a ten-week lead time.

One Contract, One Project Manager

Design, cabinetry, stone, tiling, plumbing, electrics, lighting and appliance installation sit under a single contract. There is nobody to blame sideways when the sink cut-out is wrong, because every one of those trades reports to the same person.

An Itemised Quotation, Not a Lump Sum

You get a line-by-line breakdown: carcass and front specification, worktop material and square metreage, hardware brand, tiling area, MEP scope, appliance installation. Compare it against any other kitchen renovation company in Dubai and you will actually be comparing the same things.

Building Approvals Handled Here

Towers and gated communities have their own rules on working hours, waste removal, water isolation and contractor insurance. Our approvals team deals with the building or community office directly, which is usually the difference between starting on Monday and starting in three weeks.

Trading in Dubai Since 1996

Nearly thirty years in the same city, working across villas, apartments, hotels and commercial interiors. If something needs attention after handover, we are still here — and still at the same address.

Compare Kitchen Renovation Quotes Before You Commit

Compare the same layout, material specification and renovation scope. Use these questions to check what Halo offers and what each quotation includes before choosing who will carry out your kitchen renovation.

The quotation

The Halo Experience
  • Line-by-line: cabinetry per metre, worktop per square metre, hardware brand, MEP scope
  • Appliance supply stated as included or excluded, in writing
  • Variations priced and approved before they are built
What to Confirm
  • Are the cabinet construction, fittings, surfaces and quantities the same?
  • Are appliance supply, removal, services, fees and VAT clearly identified?
  • How are changes priced and approved before work proceeds?

Who makes the cabinets

The Halo Experience
  • Manufactured in our own Al Quoz workshop to your measured dimensions
  • Adjustments and replacement parts coordinated with our local workshop
  • The hardware brand named on the quotation, not described as "premium"
What to Confirm
  • Who manufactures the cabinets and checks the final site dimensions?
  • What drawings and finish samples are approved before manufacture?
  • What is the process and lead time for adjustments or replacement parts?

Accountability

The Halo Experience
  • One contract covering design, joinery, stone, tiling, MEP and installation
  • A named project manager from the first site visit to snag close-out
What to Confirm
  • Who coordinates cabinetry, worktops, services and appliance installation?
  • Which team and project manager are responsible for the agreed scope?

Building approvals

The Halo Experience
  • Contractor documentation, insurances and access permits submitted by our approvals team
  • Working hours, waste routes and water isolation agreed with the building before mobilisation
What to Confirm
  • Which permissions apply to this property and proposed work?
  • Who submits the documents, pays the fees and arranges access?

After handover

The Halo Experience
  • Snag list closed by us before the kitchen is signed off
  • A company that has traded in Dubai since 1996 and is still reachable afterwards
What to Confirm
  • What checks, snag close-out and product care information are included?
  • What written warranty applies, what does it exclude and who handles a claim?

Kitchen Layouts, Styles and Surfaces We Build in Dubai

A kitchen design conversation usually starts with a photo and ends with a drainage diagram. Both matter. Below is the range Halo actually builds — the layouts that suit Dubai apartments and villas, the styles our workshop produces, the adjoining rooms we are normally asked to take on at the same time, and the worktop materials worth considering. What decides your layout is not taste alone; it is the five constraints listed underneath.

Kitchen Layouts We Plan

The layout is decided by the room and the services, not by preference alone. These are the arrangements that usually work in Dubai apartments and villas.

  • Galley and parallel-run kitchens
  • L-shaped kitchens
  • U-shaped kitchens
  • Island kitchens
  • Peninsula and breakfast-bar kitchens
  • Open-plan kitchen and living
  • Show kitchen with a back or dirty kitchen
  • Single-wall kitchens for studios and small apartments
  • Broken-plan kitchens with a partial screen
  • Kitchen with an integrated dining table

Kitchen Styles & Finishes

Every style below has been built by our own workshop. The style changes the fronts, the handles and the stone — the engineering underneath stays the same.

  • Modern handleless kitchens
  • Matt lacquer kitchens
  • High-gloss kitchens
  • Natural veneer and walnut kitchens
  • Fluted and ribbed timber fronts
  • Shaker and classic in-frame kitchens
  • Neoclassical kitchens with moulded detail
  • Minimalist and Japandi kitchens
  • Industrial kitchens with metal and concrete finishes
  • Two-tone kitchens with a contrast island

Rooms We Fit Out Alongside

A kitchen project rarely stops at the kitchen door. These are the adjoining spaces we are usually asked to take on at the same time.

  • Back kitchens and dirty kitchens
  • Walk-in pantries and larders
  • Laundry and utility rooms
  • Breakfast and dining areas
  • Bars, wine walls and coffee stations
  • Maid’s room kitchenettes
  • Outdoor and terrace kitchens
  • Storage and cleaning cupboards

Worktop & Surface Options

The worktop is usually the single biggest material decision in the quotation, and the one most people change their mind on twice.

  • Engineered quartz
  • Large-format porcelain and sintered stone
  • Granite
  • Natural marble
  • Solid surface and Corian-type materials
  • Stainless steel for back kitchens
  • Solid timber and butcher-block details
  • Microcement and seamless finishes

What decides your kitchen layout before style does

Two kitchens of identical size in the same building can carry very different designs, and the reason is almost always technical rather than aesthetic. These are the five constraints we check at the site visit.

Where the drainage runs

The waste stack position and the fall available to it decide how far a sink can move. In apartments it is often the single hardest constraint on the layout.

The extraction route

Ducting to an existing riser, recirculating with carbon filters, or something in between. This is settled at design stage because it affects ceiling heights and cabinetry.

Electrical capacity

Induction, two ovens, a wine fridge and a dishwasher add real load. The existing board and circuits are checked before the appliance list is finalised.

Room dimensions and clearances

Island kitchens need working clearance on every side. A room that is 40cm too narrow will not become an island kitchen, whatever the mood board says.

What the building will permit

Towers restrict wet-area changes, gas alterations and structural work differently. The permitted scope is confirmed before the design is signed off.

Our Kitchen Renovation Process

Site Visit & Measured Survey

Measure the room, record the existing services, check access and agree what stays, what goes and how you want to use the kitchen.

Layout, 3D Design & Samples

Develop the layout and appearance, then compare physical door, worktop and handle samples. Confirm appliance models and storage priorities.

Itemised Quotation & Scope

Agree cabinetry, worktops, fittings and installation alongside the separately identified site works, appliances, fees, exclusions and programme.

Final Measure & Drawing Approval

Check site dimensions and approve the coordinated plans, cabinet elevations, internal layouts, appliance clearances and finish schedule before cutting.

Building NOC & Access

Confirm the property requirements and arrange the applicable contractor documentation, access permits, delivery windows and service-lift bookings.

Workshop Manufacture

Cut, edge, assemble and finish the kitchen cabinetry in our Al Quoz workshop to the approved drawing revision, with finish and fitting checks before delivery.

Site Preparation & Cabinet Fitting

Complete the agreed removal, making good and service changes, then deliver, fix and level the cabinets. Site preparation can overlap with manufacture where the programme allows.

Worktops, Testing & Handover

Template worktops after the cabinets are set, fit the splashback and agreed appliances, test connections, adjust hardware and close the snag list. Hand over care and warranty information.

Kitchen Renovation Cost in Dubai

Nobody enjoys a website that refuses to talk about money, so here is the honest shape of it. Kitchen renovation in Dubai generally falls within the ranges below. They are indicative market figures for planning — what your kitchen costs depends on its size, its finish and how far the services have to move.

Cosmetic refresh, existing layout keptFrom AED 15,000 to AED 35,000
Apartment kitchen, same layoutFrom AED 40,000 to AED 75,000
Villa kitchen, new layout and islandFrom AED 80,000 to AED 160,000
Large or luxury kitchen, full remodelFrom AED 160,000 +

Cosmetic kitchen refresh

Normally included
New doors and drawer fronts on sound carcasses, new handles and hinges, a replacement worktop, splashback, painting and a service of the existing plumbing and electrics.
Normally excluded
Layout change, new carcasses, moving the sink or hob, and any appliance supply.
What moves the cost
Whether the existing carcasses are genuinely reusable, the worktop material, and how many fronts are non-standard sizes.

Full kitchen replacement, layout unchanged

Normally included
Strip-out and disposal, new custom cabinetry, quartz or porcelain worktops, splashback, under-cabinet lighting, appliance installation and the electrical and plumbing work the new units need.
Normally excluded
Relocating drainage or gas, ceiling and flooring replacement beyond making good, and appliance supply unless quoted separately.
What moves the cost
Run length in linear metres, front finish, worktop material, hardware specification and how many tall units and pull-outs are in the design.

Kitchen remodel with layout change

Normally included
Everything above plus non-structural wall changes, relocated water, waste and appliance circuits, a re-planned extraction route, new flooring and a new ceiling with lighting set out to the fresh layout.
Normally excluded
Structural alterations, works outside the kitchen footprint, and anything the building will not permit on drainage.
What moves the cost
How far services have to move, the fall available on the waste, the slab and riser positions, and the building’s rules on wet-area alterations.

Island and breakfast counter

Normally included
Island carcass and joinery, worktop with the chosen edge or waterfall detail, seating overhang support, sockets, and the drainage or electrical feed if a sink or hob sits in it.
Normally excluded
Extraction over the island where the ceiling or slab makes a duct route impossible.
What moves the cost
Whether services have to be chased into the slab, the stone specification, the number of waterfall returns, and the overhang span.

Worktops and splashbacks supplied separately

Normally included
Site templating, fabrication, cut-outs, edge profiling, delivery, installation, joint bonding and sealing.
Normally excluded
Removing the existing worktop where the cabinets below are being kept, and any cabinet levelling the old top was hiding.
What moves the cost
Material and slab yield, the number of joints, cut-outs and drainer grooves, and whether a full-height slab splashback is included.

Pantry, laundry and back-kitchen fit-out

Normally included
Tall pantry and larder units, appliance garages, laundry worktop and stacking provision, cleaning stores and hard-wearing surfaces.
Normally excluded
White goods, and any structural work to create the room in the first place.
What moves the cost
Total run length, internal fittings and pull-out mechanisms, and whether the space is being created or simply fitted out.
  • Every figure above is an indicative market range, not a quotation. Your number comes from a scope priced against your kitchen.
  • Ranges are stated exclusive of VAT, which is applied at the prevailing UAE rate.
  • Design support and 3D visuals are included in Halo kitchen scopes for confirmed projects unless your proposal says otherwise.
  • Appliances are normally quoted as a separate line, so you can buy them on your own terms or through us — whichever gives you the better price.
  • A site visit is required before we issue a price. Drainage falls, slab construction and what the building permits are the three unknowns that move a kitchen quotation most.

What Moves the Cost on Your Kitchen

Two kitchens the same size can be AED 60,000 apart, and the difference is rarely where people expect. Run length and worktop material do most of the work. Relocating drainage, adding tall housings for integrated appliances and choosing a lacquer front over laminate do the rest.

That is why the ranges above are a starting point and not an answer. After the site visit you get an itemised proposal against a defined scope — so you can put it next to any other kitchen quotation and compare like for like.

Size and run length

Kitchens are priced in linear metres of cabinetry and square metres of stone before anything else is counted.

Front finish and carcass spec

Laminate, matt lacquer, high-gloss, veneer and fluted timber sit at very different points on the same drawing.

Worktop material

Quartz, porcelain, granite and natural marble can differ by a factor of three or more per square metre.

How far the services move

Keeping the sink and hob where they are saves real money. Moving drainage is where budgets quietly go.

Appliance package

Fully integrated units, tall housings, wine cabinets and built-in coffee machines all add cabinetry as well as cost.

Access and building rules

Lift bookings, restricted working hours, waste removal routes and out-of-hours noisy works all affect resourcing.

How Long Does a Kitchen Renovation Take?

Six to ten weeks from signed quotation to a working kitchen, for most projects. The phases below are what we plan against. Manufacture runs in parallel with site works, so the room itself is usually out of use for two to four weeks rather than the whole programme.

  1. Site visit and survey
    2 – 5 days

    Measurements, service positions, building rules and the initial brief.

  2. Design, 3D views and quotation
    1 – 2 weeks

    Layout options, visuals, samples and an itemised proposal to sign off.

  3. Building NOC and access permits
    3 days – 2 weeks

    Contractor documentation and insurances where the tower or community requires them.

  4. Manufacture in our workshop
    3 – 5 weeks

    Cabinetry cut, edged, assembled and finished in Al Quoz while site works run.

  5. Strip-out, services and installation
    2 – 4 weeks

    Demolition, MEP first fix, tiling, ceiling, cabinet installation and second fix.

  6. Worktops, snagging and handover
    1 – 2 weeks

    Stone templating and fitting, appliances connected, adjustments and final clean.

Phases overlap. Cabinets are being built in Al Quoz while the strip-out and first fix happen at your property — adding the ranges together does not give you the project duration.

Your Kitchen Project Is Protected

You are handing strangers the keys to your home and letting them take a room apart. These are the commitments that sit around the work itself.

A written scope before demolition

Nothing gets pulled off the wall until the scope and the itemised quotation are signed. If something changes once the old kitchen is out — and occasionally it does — it is priced and approved in writing before it is built.

Payments tied to stages, not dates

Design and manufacture, installation, then completion. Each release is against work you can see and inspect, so you are never paying substantially ahead of what has actually been done in your home.

One person who owns the job

A named project manager coordinates the strip-out crew, the MEP team, the stone fabricator and the installers, books the lift, and is the number you call. Not a rotating WhatsApp group.

Licensed, insured and accepted by buildings

Halo submits as a licensed contractor with the documentation towers and community offices expect, which is why access is usually granted first time.

Protection of the rest of your home

Floor protection, dust screening, a defined material route and a daily clean-down. A kitchen renovation should not redecorate your corridor by accident.

Reachable after handover

Doors settle, silicone moves, a soft-close needs adjusting. The team stays contactable, and Halo has been at the same Dubai address since 1996.

Renovating a Kitchen While You Still Live There

Most of our kitchen clients stay in the property throughout. It is manageable, but only if the practical side is planned before day one rather than improvised on day three. These are the controls we put in place — the right combination depends on your home and your building.

A Temporary Kitchen Setup

Where the family is staying put, we set aside a worktop, the fridge and a power point somewhere sensible so the household still functions.

Protected Routes & Floors

A defined path from the lift or front door to the kitchen, boards over finished floors, and the rest of the home screened off.

Dust and Noise Control

Screening at the doorway, extraction on the cutting tools, and noisy demolition scheduled inside the hours your building allows.

Work Around Your Building’s Rules

Lift bookings, permitted working hours, weekend restrictions and waste removal windows are agreed before the first day on site.

Planned Water and Power Isolation

Isolation is arranged with building management and timed so it lands in one short window rather than repeatedly across the job.

Kitchen Projects We Deliver

Pick the one that sounds like your situation. The site visit confirms the scope from there.

01

Villa Kitchen Renovation

Larger footprints, an island, a show kitchen with a working back kitchen behind it, and usually more freedom to move services. Community approvals handled by us.

Plan a Villa Kitchen
02

Apartment Kitchen Renovation

Tower rules, lift bookings, restricted hours and drainage you cannot move far. We work inside those limits and handle the building NOC.

Discuss an Apartment Kitchen
03

Handover & Off-Plan Kitchen Upgrades

Developer kitchens are built to a budget. Replacing fronts, worktops and storage — or the whole unit — before you move in is the cheapest time to do it.

Upgrade a Handover Kitchen
04

Rental & Resale Refresh

A controlled-budget refresh aimed at the viewing rather than the architecture: fronts, worktop, splashback, lighting and handles.

Price a Kitchen Refresh

What Our Residential Clients Say

Google

Timur G

Google Review

We engaged Halo Interiors for a turnkey renovation project at our property in Dubai Creek Harbour. Halo handled the entire project including design, procurement, permits, and execution of the works. Halo worked to a tight deadline and delivered a stunning design, which they then implemented to a very high standard. The quality of execution was head and shoulders above anything else I have seen in Dubai, with attention to every detail and very thorough quality control. As a client, I also felt that Halo were very honest in our dealings and this really made a difference. The pricing was also competitive and fully transparent. I cannot recommend Halo highly enough.

See full Google review
Google

AJ Boelens

Google Review

I am so thankful Jason and Zishan from Halo for their help to conduct a property inspection and support us in how to handle a renovation project that went terribly wrong. If I could do things over again, I would have consulted with Halo prior to our renovation project and would have asked for their guidance and project management support. There are a lot of shady contractors in Dubai apparently and these guys are the only honest people you can rely on. I would give them 6 stars if I could!

See full Google review
Google

limelight interors

Google Review

We have had the pleasure of working with Halo Interiors on three different projects, and the experience has been nothing short of exceptional. Our clients have praised the quality and service provided, and we have not faced a complaint. Their premium quality joinery speaks for itself. A special mention to Huzefa, the project manager, who expertly handled our most recent renovation. I highly recommend Halo Interiors to anyone seeking top-notch craftsmanship and reliable service.

See full Google review
Google

Mansi shah

Google Review

We contracted Halo for our first villa upgrade project in early 2022 and we have been using their services since then. I cannot but help appreciate the extra effort they take to ensure all our requirements are addressed. Extremely professional and reliable. I would recommend them without hesitation!

See full Google review

4.8

1,200+ projects completed

Kitchen Renovation Across Dubai

Halo renovates kitchens in villas, apartments and townhouses right across Dubai — from Emirates Hills and Palm Jumeirah to Marina towers, Downtown apartments, Arabian Ranches, Dubai Hills, Jumeirah, Mirdif and Al Khawaneej. Every building and community sets its own working hours, access rules and waste-removal windows, so those are confirmed for your address before the programme is fixed rather than assumed from the district.

Halo works with homeowners, interior designers and developers across Dubai, and has delivered projects for Dubai Properties, Jumeirah, Majid Al Futtaim, One&Only, Rotana, Sheraton and Siemens.

Across DubaiKitchen renovation enquiries city-wide
Select a community to locate it

Villa Communities

Apartment Districts

Established Dubai

Community not listed? Send the location and a photo of the kitchen — the process is the same wherever you are in Dubai.

Check My Community

Why Renovate a Kitchen in Dubai

Almost nobody renovates a kitchen purely because they dislike the colour. There is usually something practical underneath.

Get the layout right

Most dated Dubai kitchens are closed off, badly zoned, or built around an appliance nobody has owned for a decade. Fixing the working triangle and the circulation changes the room more than any finish will.

Storage that actually holds things

Full-height units instead of a dead soffit, pull-out larders instead of a deep cupboard you cannot reach into, and drawers rather than base cupboards. Same footprint, roughly a third more usable capacity.

Improve what the property is worth

Kitchens and bathrooms are the two rooms buyers and tenants price hardest in Dubai. A well-built kitchen tends to be the single most persuasive room at viewing.

Deal with water damage properly

Swollen carcass bases, blown MDF around the sink and a slow leak behind the dishwasher are extremely common here. A renovation is when the waterproofing and the plumbing get put right, not patched.

Fix the heat and the smell

Poor extraction and an AC diffuser blowing across the hob are a Dubai speciality. Getting the extraction route and the cooling right makes the kitchen usable in August.

Surfaces that survive daily use

Quartz and porcelain resist heat, staining and the abuse a family kitchen takes. Cheap laminate tops and thin foil fronts do not last long in this climate, and it shows within two summers.

Kitchen Renovation Approvals and Building Rules in Dubai

What you need on paper depends entirely on where you live and what you are changing. A like-for-like replacement in a villa may need almost nothing; moving drainage in a Downtown tower is a different conversation. We identify the route that applies to your property at the site visit, and handle the submissions from there.

Building or community NOC

Most Dubai towers and gated communities require a fit-out or works NOC, a licensed contractor and valid insurance on file before access is granted.

Related Halo capability

Authority approvals and project management

Wet-area, drainage and gas alterations

Moving a sink, a waste run or a gas point can require drawings and approval. What is permitted depends on the building, the slab and the riser layout.

Related Halo capability

MEP & plumbing and waterproofing and tiling

Electrical loads and DEWA-related work

Induction hobs, ovens and integrated appliances add load. Circuits, protection and any distribution board change are assessed against the existing installation.

Related Halo capability

Electrical works coordinated with kitchen joinery

Access, waste removal and working hours

Lift protection, service-lift bookings, skip or waste routes, permitted hours and site access passes close the practical side of the approval loop.

Related Halo capability

Licensed contracting, site supervision and turnkey fit-out handover

Comparing Kitchen Renovation Companies in Dubai

Shortlist companies using relevant kitchen projects and a clear, written scope. Ask each team these six questions, then compare the materials, responsibilities, exclusions and handover terms alongside the price.

Do they manufacture, or do they resell?

Knowing who makes the cabinets helps you check production drawings, lead times and responsibility for adjustments.

Halo

Cabinets, islands and pantry units are made in our own Al Quoz workshop, so remakes and adjustments happen here.

Is the quotation itemised or a lump sum?

An itemised scope lets you compare the same materials, quantities and site works, including exclusions and allowances.

Halo

You get cabinetry per linear metre, worktop per square metre, hardware brand, tiling area and MEP scope, line by line.

Who does the plumbing and electrical work?

Sink relocation, appliance circuits and extraction need coordination with the cabinetry, building services and permitted scope.

Halo

Our own MEP team handles water, waste, circuits and extraction under the same contract and the same project manager.

Which hardware brand is actually being quoted?

Check the specified hinge and drawer range, quantities and load requirements rather than relying on the word "premium".

Halo

The agreed brand or range, soft-close operation and storage accessories are recorded in the fittings schedule and quotation.

Will they handle the building NOC?

Confirm the requirements for your property, the proposed alterations, permitted working hours and delivery arrangements before setting the start date.

Halo

Our approvals team deals with building management or the community office directly.

What happens to the snags?

A kitchen is judged on the last five per cent: door alignment, silicone lines, a drawer that catches.

Halo

We snag the kitchen ourselves before handover, close the list, and stay reachable afterwards.

Kitchen Renovation Frequently Asked Questions

Straight answers to what Dubai homeowners actually ask before committing to a kitchen renovation.

Compare companies against the same measured layout and written specification. Ask for relevant kitchen project photographs, the cabinet construction and fittings schedule, responsibility for plumbing and electrical work, applicable approvals, the installation programme, inclusions and exclusions, written warranty terms and the snagging process. Halo can quote the agreed design, in-house cabinetry and renovation works under one coordinated scope; use those details to compare like for like.

Send your community or building, room photos, approximate wall lengths and ceiling height, whether you need cabinets only or a full renovation, preferred finishes, appliance models if known, budget and timing. Existing drawings help but are not required to enquire. A firm price follows a site survey and an agreed specification and scope.

Approve the measured plan, cabinet elevations and internal layouts, appliance models and clearances, board and edge specification, physical finish samples, worktop details and fittings schedule. Record the drawing revision and any exclusions. A 3D visual shows the appearance but does not replace dimensioned production drawings.

Yes. Send the drawing set, materials and fittings specification for a manufacture-and-installation quotation. Halo checks the site dimensions and coordinates production drawings before workshop manufacture. If you also need removal, services, tiling or a wider renovation, those works should be defined and priced in the agreed scope.

As an indicative market range, a cosmetic kitchen refresh in Dubai starts around AED 15,000, a full apartment kitchen replacement on the same layout typically runs AED 40,000 to AED 75,000, and a villa kitchen with a new layout and island generally falls between AED 80,000 and AED 160,000. Large or heavily specified kitchens go above that. Those are planning figures, not a quotation. What your kitchen actually costs comes down to the run length in linear metres, the front finish, the worktop material, how far the plumbing and electrics have to move, the appliance package and what your building permits — which is why we survey the room before we price it.

From signed quotation to a working kitchen, most Dubai projects run six to ten weeks. Manufacture in our workshop takes three to five weeks and overlaps with the site works, so the room itself is usually out of action for two to four weeks. Worktops add another week to ten days after the cabinets are installed, because stone is templated on site rather than cut to the drawing. A layout change with relocated drainage, or a building that restricts working hours, pushes the programme out — we give you dates once we have surveyed the space.

Yes. Halo has run its own joinery factory in Al Quoz since the 1990s. Carcasses, doors, islands, tall units and pantry joinery are cut, edged, assembled and finished here in Dubai, which is why the cabinets are sized to your walls rather than to standard modules, and why a damaged or wrong part is remade in days instead of reordered from Europe.

Yes, and most of our kitchen work is in towers. What changes is the process rather than the craft: the building NOC, contractor insurance and access permits are submitted by our approvals team, lift bookings and waste routes are agreed in advance, noisy work is scheduled inside permitted hours, and any water isolation is planned with building management so it happens once. What towers usually restrict is how far drainage can move, which we confirm at the survey before drawing a layout that will not be approved.

Not the kitchen itself, no — once the strip-out starts, the room is a site. What we can do is set up a temporary arrangement elsewhere in the home with the fridge, a worktop, a kettle and a power point, screen the works off from the rest of the property, and protect the route in and out. Families generally manage a two to four week window with that in place. If you are renovating the whole home, we will sequence the kitchen so it comes back first.

Either. Plenty of clients buy their own during a promotion and simply send us the model numbers so the cabinetry is built to the real cut-out and ventilation dimensions. Others prefer us to supply and install the package, which is quoted as a separate line so you can see the price and compare it. What matters more than who buys them is that the list is fixed before manufacture — changing an oven size after the tall units are made is an expensive afternoon.

Usually, within limits. Water feeds are relatively easy. Waste is harder, because it needs fall to the existing stack and there is only so much floor build-up available before the kitchen sits higher than the rest of the apartment. Extraction depends on whether a duct route to a riser or an external wall exists — where it does not, a recirculating hood with carbon filtration is the honest answer. All three are checked at the site visit, and the layout is drawn around what is genuinely possible rather than what would be nice.

For most family kitchens in Dubai, engineered quartz is the sensible default: hard, non-porous, consistent, and it handles daily use without ceremony. Large-format porcelain and sintered stone are better where heat and UV matter, including outdoor and terrace kitchens. Granite is durable and cheaper than it used to be, though the pattern is less controllable. Natural marble is beautiful and will etch and stain — clients who love it choose it knowing that, and we say so before it is ordered rather than after.

A full kitchen renovation with Halo covers design and 3D visuals, strip-out and disposal of the old kitchen, making good to walls, floors and ceilings, plumbing and electrical work for the new layout, extraction, tiling and splashback, custom cabinetry manufactured in our workshop, worktops templated and fitted on site, lighting, appliance installation and connection, then snagging and a final clean. The exact inclusions are written into your scope after the survey rather than assumed from a package name.

Yes. Most Dubai towers and gated communities require a works NOC, a licensed contractor and valid insurance before access is granted, and some require drawings for wet-area or gas alterations. Our in-house approvals team submits the documentation and arranges the access permits. Requirements vary by building and by the scope of what you are changing, so the applicable route is identified at the site visit rather than promised in advance.

If the carcasses are sound, yes — and it can be a genuinely good decision. New fronts, new handles and hinges, a new worktop and splashback, and better lighting will transform how a kitchen looks for a fraction of a full replacement. The catch is that water-damaged bases, sagging shelves and a layout that never worked are not solved by new doors. We will tell you honestly at the survey which of the two you are looking at.

Both. Design is part of the scope for confirmed projects: measured survey, layout options, 3D visuals, and material and hardware selection against real samples. We also build to other people’s drawings — if you are working with an interior designer, we regularly take their scheme through technical detailing, manufacture and installation, flagging anything that cannot be built as drawn instead of quietly changing it on site.

German and Austrian systems — Blum, Hettich and Häfele are the ones we specify most — and whichever is quoted is named on your proposal rather than described as "premium". Soft-close hinges and runners as standard, with lift systems, corner mechanisms, larder pull-outs and internal dividers specified per unit. Hardware is the part of a kitchen that gets used ten thousand times a year, and it is the cheapest place to over-specify and the most expensive place to save.

All of it. Villa communities including Emirates Hills, Palm Jumeirah, Arabian Ranches, Dubai Hills Estate, The Meadows, The Springs and DAMAC Hills; apartment districts including Downtown, Business Bay, Dubai Marina, JBR, JLT, Dubai Creek Harbour and JVC; and established areas such as Jumeirah, Umm Suqeim, Al Barsha, Mirdif and Al Khawaneej. Each building or community sets its own access rules and working hours, so those are confirmed for your address rather than assumed from the district.

Send us the location, roughly how large the kitchen is, whether the layout is staying or changing, and a few photos — WhatsApp is easiest. We will give you a sense of the range on the phone, then arrange a free site visit to measure the room and check the services. The itemised quotation follows the visit, priced against a written scope you can compare line by line with anyone else you are speaking to.

Tell Us About Your Kitchen

A few details and a couple of photos are enough for us to give you a realistic range on WhatsApp. If it looks like a fit, we will arrange a free site visit and measure up.

01
Made in Our Own Workshop

Cabinets, islands and pantry units manufactured in Al Quoz, sized to your walls.

02
Itemised Quotation

Cabinetry per metre, worktop per square metre, hardware brand named — nothing hidden in a lump sum.

03
Building NOCs Handled

Contractor documentation, insurance and access permits submitted by our approvals team.

Book a Free Kitchen Site Visit

Your details will only be used to discuss your kitchen renovation.

Book Your Free Kitchen Site Visit

Send us the location, a rough size and a few photos of the kitchen as it is today. We will come and measure, talk through what is possible, and give you an itemised quotation. Since 1996 • DM Approved • DEWA Certified • In-House Joinery in Al Quoz • Turnkey Delivery