Client
Abhishek

Dramatic Jumeirah Living WTC bathroom combining a sculptural microcement double vanity, metallic vessel basins, bespoke mirrors, textured decorative finishes and layered architectural lighting.
Bespoke bathroom transformation for Abhishek at Jumeirah Living WTC, featuring a sculptural seamless microcement double vanity, twin metallic vessel basins, layered custom mirrors, an illuminated abstract feature wall and statement pendant lighting by Halo Interiors.

A dramatic contemporary luxury bathroom transformation at Jumeirah Living World Trade Centre Residences in Dubai, combining a custom microcement vanity, metallic sanitaryware, bespoke mirror work, decorative wall treatments and layered architectural lighting to create a highly individual private bathroom.
Book a Free Site VisitThe centrepiece is the substantial custom double vanity finished entirely in seamless microcement. Formed as a monolithic architectural volume with beautifully softened rounded corners, the vanity demonstrates the versatility of microcement in creating continuous sculptural surfaces without conventional joints or visible transitions.
The warm off-white microcement finish gives the vanity a tactile, hand-finished character while providing a restrained backdrop for two oversized brushed bronze / dark metallic vessel basins. The contrast between the seamless mineral surface and metallic sanitaryware gives the bathroom a sophisticated contemporary identity.
The twin basins are paired with tall metallic mixers, reinforcing the bronze-toned detailing and creating a refined hospitality-inspired vanity composition.
Behind the vanity is a highly distinctive bespoke decorative feature wall, composed of sweeping abstract dark and neutral forms. The textured treatment creates an artistic backdrop rather than a conventional tiled bathroom wall, while concealed illumination accentuates the curved pattern and adds visual depth.
Four custom mirrors are arranged symmetrically across the feature wall. The upper pair features elongated pill-shaped mirrors with rounded bases, while two smaller curved mirrors below create an unusual layered composition directly behind the basins.
Integrated backlighting behind the feature wall and mirrors creates a soft halo around the composition, highlighting the curved forms and complementing the seamless geometry of the microcement vanity.
Suspended centrally above the vanity is a sculptural honeycomb-patterned metallic pendant light. The decorative fitting acts almost like jewellery within the bathroom, casting patterned illumination while coordinating with the metallic basins, mixers and accessories.
The surrounding walls feature subtle textured decorative finishes in warm grey and neutral tones, complementing the mineral character of the microcement and creating a more seamless residential atmosphere than a conventionally tiled bathroom.
A recessed wall niche incorporates warm integrated lighting and a metallic-toned interior, creating a dedicated display area for decorative objects and bathroom accessories.
The consistent use of rounded forms — from the microcement vanity and vessel basins to the mirrors and sweeping wall graphics — creates a cohesive architectural language throughout the bathroom.
Delivered by Halo Interiors, this project showcases our capabilities in luxury apartment renovation, microcement application and high-end bathroom fitout in Dubai, bringing together specialist microcement finishes, custom vanity construction, decorative wall treatments, bespoke mirror works, sanitaryware, lighting, waterproofing, plumbing, electrical and MEP coordination within one highly personalised interior.
Luxury Apartment Renovation · Bathroom Renovation · Microcement · Interior Fitout · Decorative Finishes · Mirror Works · Architectural Lighting · MEP
Abhishek
Jumeirah Living World Trade Centre Residences, Dubai
Luxury Apartment / Residence
Luxury Bathroom, Double Vanity & Wellness Area
Luxury Apartment Renovation & Property Transformation
Halo Interiors LLC
Dubai, UAE
Everything visible in this photograph, delivered by one team under one contract.
31 line items · one contract · one project manager
Every trade on this project was ours. Nothing in the list below was subcontracted out and coordinated by email.
The palette specified and installed for this space.

A monolithic volume with softened rounded corners and no visible joints or transitions

Oversized metallic bowls set against the seamless mineral surface

Sweeping dark and neutral forms, lit from behind so the curves read as an artwork

Four pieces — an upper pill-shaped pair over two smaller curved mirrors behind the basins

A recessed display bay with a metallic-toned interior and warm integrated lighting

Concealed at the ceiling perimeter and behind the mirrors, halo-lighting the feature wall
The detailing that gives the space its character.
We work across Jumeirah Living WTC and the communities around it. Wherever your property is, the survey, the approvals and the build follow the same process.

Premium apartment renovation in Downtown Dubai — Burj-district towers, Old Town and Boulevard residences. Building NOCs and turnkey delivery by Halo.

Apartment renovation in Business Bay — investor upgrades, kitchens, bathrooms and full unit renewals across the Bay towers, NOCs handled. Free quote.

Apartment renovation in Dubai Marina — kitchens, bathrooms, flooring and full upgrades in Marina towers, with building NOCs and logistics handled. Free quote.

Apartment renovation in JVC — smart-budget upgrades, kitchens, bathrooms and full renewals across Jumeirah Village Circle buildings and townhouses.
Not listed? We work across the whole of Dubai.
The questions Jumeirah Living WTC owners ask us most before they start.
It follows the scope and the finish level rather than the floor area — a single bathroom rebuilt with a custom microcement vanity and bespoke mirrors can carry more value than a whole-apartment repaint. We survey first, then issue an itemised, line-by-line proposal against a defined scope with a dated programme and milestone payments, including the building access and protection costs rather than adding them later.
Yes. Building management issues the fit-out NOC and sets the working hours, lift booking, delivery windows and protection requirements. A Dubai Municipality permit is added where the works touch wet areas or partitions, and DEWA where electrical loads change. We prepare and submit all of it and do not start on site until it is in hand.
Yes — it is the finish this building is most often renovated with, because it produces a continuous, rounded, joint-free surface that tiling cannot. The condition is the substrate: we strip back, re-tank the wet area, prove it, and apply afterwards. Applied over existing tile or a tired membrane it will fail, which is why we always quote the waterproofing and the finish together.
A single luxury bathroom is usually 6–10 weeks on site; a full apartment interior runs 10–16 weeks. Add roughly 2–4 weeks before site start for the NOC and the access bookings. The building’s working hours and lift windows stretch a programme compared with a villa, which is why we agree them before we commit to a date rather than after.
That is exactly what the building’s rules are written to prevent, and we work to them rather than around them. Noisy trades are confined to the permitted hours, corridors and lifts are protected before the first delivery, waste leaves in booked windows, and the unit is kept sealed and cleaned daily. Management sees a contractor they have an agreement with, not a complaint.
Guides on renovating in Dubai — costs, approvals and what to expect.
Waterproofing, strip-out, drainage falls, MEP first fix, ventilation and vanity joinery — the stages that decide whether a Dubai bathroom renovation holds, and where they most often go wrong.
Read MoreSwollen carcasses, delaminating edges and seized runners are specification failures, not design failures. What board grades, hardware, worktops and installation sequencing actually survive Dubai's climate.
Read MoreA plain-English guide to planning a bedroom in Dubai — layout and clearances, the headboard wall, wardrobe position, lighting, cooling and finishes that last.
Read MoreTell us about your space and what you want to change. We'll reply on WhatsApp and book a free site visit to talk through scope, budget and timing.
The NOC, the working-hour agreement, the service-lift booking, the delivery and waste windows and the common-area protection are all part of our scope. In a managed tower these are the things that move a completion date, so we handle them rather than leaving them with the owner.
A seamless finish fails at the substrate, not at the surface. We prepare, waterproof and apply as one scope — so there is no gap between the contractor who built the vanity and the applicator who has to make it read as a single piece.
Everything bespoke here has to arrive through a booked service lift and a protected corridor. We build in our own factory to sizes and joints set out for that route, which is a design decision made at drawing stage rather than a problem discovered on delivery day.
Book a free site visit and get a line-by-line quote — clear scope, a dated schedule, and payments by milestone.